MoveCargoHubForklifts, conveyors, racks, hoists, carts, warehouse and lifting equipment for global industrial buyers.
Prefabricated High Rise Steel Building Structures
Dock Levelers

Prefabricated High Rise Steel Building Structures | RFQ Sourcing Details

Dock Levelers · Quote on request

This is a product procurement detail page: check specs, images, category context and related sourcing paths before sending an RFQ.

Quote on request

Product specs

CategoryDock Levelers
Unitset
CategoryDock Levelers
AvailabilityInquiry required
Updated2026-05-26

Buyer's Digest

Use this page as a product-first sourcing checkpoint before sending an RFQ. Category: Dock Levelers. Confirm application fit, capacity, materials, destination, lead time and compliance requirements before comparing suppliers.

Original product description

Prefabricated High Rise Steel Building Structures Column and Beam Q235, Q345 H section steel or square tube Roof Sandwich panels with EPS, rock wool, fiber glass.

Corrugated Steel sheet or with insulation layer Wall Steel mesh and tarpaulin or sandwich panel or steel sheet Brace Round bar Purlin C or Z section steel Accessories High strength bolts Feeding system As the customer's requirements 1.

As follows is the prictures of steel structure buildings which we have been built: 2. The advantage of our building (1) Enough strong it can resist 70m/s hurricane and G10 seismic intensity and protect your life and property. Furthermore, we also can design and build a stronger building according to your required.

(2) No water-seepage problem. we designed a whole reasonable and effective method of flashing plate and over-lapped of steel sheet, with superior quality closure strips.

(3) High-performance heat insulation 35mm PU = 50mm EPS = 55 glass wool/fiberglass = 60mm rockwool = 475mm concrete = 1075mm brick (4) Excellent Anti-corrosion and long life good shot blasting and 4 layers paint(90micron)/1 layer hot deep galvanized (80-200g/sqm) will provide our building 25-50 years life.

(5) Good air permeability and more natural lighting natural roof turbine ventilators, bridge ventilators, roof sky lighting belts, wall sky lighting belts, varies of windows, they will bring us more fresh air and natural lighting. (6) Quick installation 12 workers can assemble 1000sqm within 20 days. (7) 100% recovery.

Packaging & Shipping In usually, make the protected package on every items and ship them by 40' OT or 40'HC Our Services 1. Free Design make a free design according to your requirements. 2.

Produce every compoents of the building as follows are our production process and quality check (1) purchasing of raw material: performance of all steel plates must be in accordance with Q345 or Q235 required in country standards, no sandwich flaws, no dopants and no crack. Physical Property Steel NO.

Yield Point(N/mm2) Tensile Strength (N/mm2) Q235B Q345B Chemical Constituent (%) Steel No. C Mn Si S P Q235B ≤0.3 ≤0.045 ≤0.045 Q345B ≤ ≤0.55 ≤0.040 ≤0.040 (2) Plate cut: all notch is slippy and straight, it will be a good start for welding.

(3) Assemblage: (4) Automatic welding for H steel automatic arc-submerging welding: full weld

Prefabricated | Applications and Buyer Notes

Prefabricated is organized as a sourcing-ready Dock Levelers reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements and lead-time quest

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

1
Unit, setBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Key specifications

CategoryDock Levelers
Brand
Unitset

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

MoveCargoHub related sourcing paths

Related applications MoveCargoHub related paths

Factory Material Transfer

Related solutions MoveCargoHub related paths

Forklift And Rack Package Buying

Conveyor System Procurement

MoveCargoHub procurement phrases

MoveCargoHub related product samples

Supplier profile

Qingdao Sunway Steel Industrial Equipment Co., Ltd.
主营:Dock Levelers

Qingdao Sunway Steel Industrial Equipment Co., Ltd. focuses on dock levelers for forklifts, conveyors, racks, hoists, carts, warehouse and lifting equipment sourcing and rfq-ready export supply platform

View full profile >